Pages Navigation Menu
Categories Navigation Menu

#240W- White Right Hand Awning Window Operator for Pino Windows

Click here to enlarge

Use E-Ring #196 to attach operator to window harness

Installation Instructions/Instrucciones para la Instalacion

Awning Window Operator - Instructions

Click here to enlarge

Select new operator by:

  1. Matching mounting hole pattern of old operator to new operator
  2. Matching link length and style of old operator to new operator.

Installing new operator:

  1. Attach link to torque bar with original fasteners.
  2. Mount operator with original mounting screws.

Note: Bolts, bushings, E rings, screws, and rivets, are sold separately.

Para seleccionar su nuevo operador:

  1. Compare los huecos que se usan para instalar el operador a la ventana.
  2. Compare el largo del brazo del operador.

Para instalar el nuevo operador:

  1. Conecte el brazo del operador a la barra que se mueve en la ventana.
  2. Monte el operador a la ventana con los tornillos originales.

Nota: Los tornillos para instalar el operador a la barra y a la ventana se venden por separado.